Awarded by Sunhuan Construction for 6 units of Overhead Travelling Cranes System and 1 unit of Monorail Crane System for Substation in Jurong Island.

 

With more than 20 years of experience in the construction industry, Sunhuan Construction Pte Ltd offers construction solutions and services for Residential, Upgrading, Alternation and Addition, Institutional, Commercial, Industrial and Civil Engineering.

Having worked with Sunhuan for past projects, Jenmon was thrilled to be awarded once again by Sunhuan Construction Pte Ltd to design, supply, installed and commission 5 units of 5 Tonne & 3.2 Tonne Single-Girder and Double-Girder Overhead Travelling Cranes System complete with runway structure and iBeam corbels. In addition, 1 unit of 12 Tonne Monorail Crane system span over 17m & with height of lift of 40m for the construction of West Jurong Island 400KV substation on MK 34 Lot 3290X at Tembusu Avenue.

As this was a design and build project, there was a great deal of site co-ordination and discussion alongside owners, main contractor- Sunhuan and other subcontractors of this project. Thus, a dedicated team of Jenmon workers are required to ensure the project runs smoothly and on schedule. The estimated date of handover is in July of 2017.

Awarded by Tiong Seng Contractors for 5 units of Gantry Cranes and Overhead Travelling Cranes System for Land Transport Authority (LTA) – Thomson East Line (TEL) Project – T220

 

Tiong Seng Contractors (Pte) Ltd has more than 50 years of experience as a building / civil contractor in Singapore. Since the 1970s, the company was involved in the construction of Singapore first highways - Pan Island Expressway and Central Expressway, and later the construction of Tanjong Pagar Terminal and many other government building projects.

With several LTA projects experience, Jenmon was honored to be appointed by Tiong Seng Contractors to design, supply, installed and commission a total of 5 units of cranes for this project. Two units of 20 Tonne Gantry Cranes, two units of 20 Tonne of Double-Girder Overhead Travelling Cranes System and 1 unit of 10 Ton Gantry Crane, for the construction of T220 – a joint venture between Tiong Seng Contractors (Pte) Ltd and Dongah Geological Engineering Co. Ltd.

Thomson Line - T220 project consists of the construction of Great World station along with two pairs of tunnels designed to run along Havelock and Orchard stations on either end. Jenmon tailored the cranes for the station construction, which uses top down construction approach.

The last unit of 10 Ton Gantry Crane is estimated to be delivered in October of 2017.

Our aim is to ensure an operative crane on site at all times.

"Jenmon is made up of veterans with years of experience in the lifting industry. We are constantly updated with the latest market products, solutions and technologies, enabling us to provide solutions to suit all varieties of industrial lifting and handling systems. From the very first contact to maintenance, our team has the complete range of services tailored for you. "

Terms of use|Disclaimer|Limitation of Liability
Copyright © Jenmon 2017. All Rights Reserved

Send in your enquiry
Our consultant will provide you with the perfect lifting solutions